VapeWholesaleHub  |  Wholesale supplier · Shenzhen, China
Tel / WeChat / WhatsApp: +86 13711127975  |  vape@0099933.xyz
Home  /  Starter Vape Kit  /  Starter Vape Kit first order checklist with full documents
starter vape kits · online vape stores

Starter Vape Kit first order checklist with full documents

We ship starter vape kits to distributors, chain buyers and independent shops. What follows is the material we normally cover in a first conversation: what we hold in stock, how we test it, how it ships, and what happens when a carton arrives damaged.

Published 29 December 2025  ·  VapeWholesaleHub  ·  Reading time 5 min

Carton-ready units from the same batch, coded for traceability.
Carton-ready units from the same batch, coded for traceability.
Close inspection of the assembly line before the batch is released.
Close inspection of the assembly line before the batch is released.
Unit from the retained reference sample held against this order number.
Unit from the retained reference sample held against this order number.

Paperwork, labelling and market rules

A starter vape kit programme only works when three numbers agree: your shelf price, your reorder cycle and your defect tolerance. Change one and the plan moves. We build assortments around those three and we say so up front rather than after the invoice.

Regulation for starter vape kits differs by country and sometimes by state. We do not pretend to be your lawyer, but we do keep the document pack current and we will tell you when a configuration cannot legally enter a market you have named.

If you sell into a market that requires child-resistant packaging, say so at quotation stage. Retrofitting a CR closure onto a finished bottle design usually means a new mould and a four week delay.

Batch consistency and why it matters

A 0.5 percent defect rate sounds excellent until it lands on a 600 unit order and you are handling three returns in a week. We quote realistic rates per category and we credit in advance for the known failure modes.

We photograph the packing station during production for volume orders. It is a small thing, but it settles most arguments about what was actually in the carton before it was sealed.

For online vape stores, the practical answer is usually a shorter range: two core lines, one step-up, one trial SKU. Everything else is inventory risk wearing a nice finish.

The reorder is the real test

Returns are handled as data, not as complaints. Every reported failure is logged by mode and by batch, and the pattern is reviewed monthly with the factory.

The replacement policy is deliberately simple: report within seven days of delivery with photos and the batch code, and we replace or credit at the next shipment. We do not argue about a defect we can see in a photograph.

  • Reference sample retained from every batch
  • Named account contact who has handled the product
  • Private label files archived for future rebrands
  • Consolidated or split shipping, quoted both ways
  • Standing reorder schedule with a fixed cut-off
  • Document pack prepared per destination market

Lead times, freight and landed cost

We ship from Shenzhen and Guangzhou: air express for samples and part loads, sea freight for volume. Typical production lead time is 15 working days after artwork approval, plus transit. We quote both routes so you can see the trade-off instead of guessing at it.

Transit times move with the season. Book space early for Q4 and around Chinese New Year, when factory output pauses for two to three weeks and freight rates tighten at the same time.

Specification summary

Typical specification for this category
Battery350 mAh
Pod capacity3.0 ml
Coil resistance0.8 ohm
IncludedDevice, pod, cable
ChargingUSB-C 5V/1A
PackagingRetail box
Minimum order100 units per SKU, mixed cartons allowed
Lead time12 working days after artwork approval

We would rather lose an order at quotation stage than explain a mismatch after delivery, which is why the specification conversation comes before the price conversation.

Frequently asked

How long does production take?

Around 15 working days after artwork approval for stock configurations, plus transit. Custom runs add roughly a week for tooling and a physical dummy. We confirm the date in writing on the order acknowledgement.

What happens if part of the order is defective?

Report within seven days with photos and the batch code. Confirmed defects are replaced or credited on the next shipment. The failure is logged by mode and batch, and reviewed monthly with the factory.

Can you ship to multiple locations?

Yes. Split shipments are quoted separately because consolidation and splitting price differently. Tell us the destination list at quotation stage and we will show both options.

Related reading

Need a quotation on starter vape kits?

Send destination market, target price and quantity. Same-day reply on working days.

Tel / WeChat / WhatsApp +86 13711127975  ·  vape@0099933.xyz

Talk to the supply team

Ask for a quotation on starter vape kits

Tell us the market you sell into and the price band you work in. You will get a specification and a landed cost estimate, not a catalogue dump.

What to send

Destination market, target retail price, quantity per SKU, and whether you need private label. With those four lines we can quote the same day.

Samples ship by air express and the cost is credited against your first production order.

Email the team
WhatsApp Email us